Skip to product information
1 of 14

Pack of 3 GPS Pet Tracker - Waterproof, Real-Time Location & Safety Zone Alerts for Outdoor Adventures

Pack of 3 GPS Pet Tracker - Waterproof, Real-Time Location & Safety Zone Alerts for Outdoor Adventures

Regular price $35.95 AUD
Regular price $55.95 AUD Sale price $35.95 AUD
Save 36% Sold out
Shipping calculated at checkout.

Prevent Loss of Pets, Keys, Bags, and More

★ Real-time item location tracking
★ Connects up to 10 devices
★ Long-lasting replaceable battery
★ Lightweight and easy to carry

Colour
  • American Express
  • Mastercard
  • PayPal
  • Visa

90-Day Risk-Free Return

90-day money-back guarantee. Real results take 2–3 months, so you get the full runway to try it risk-free.

Shipping & Tracking

FREE Shipping on all orders over $150 AUD. 90-Day Comfort Guarantee. No questions asked, for any reason.

View full details

Prevent Loss of Items or Pets with Accurate Tracking

Keep your valuables and pets safe with precise real-time location tracking

Waking Up Sleeping Follicles

From runaway pets to misplaced wallets, losing items creates chaos. This smart GPS tracker locates them instantly bringing order back to your day.

How It Work? The tracker connects to your smartphone via Bluetooth and a dedicated app.

When an item goes missing, use the app to make it ring or view its last known location directly on your phone.

Track Pets and Items Anytime, Anywhere with Ease

  • Instant Location Alerts

    Avoid the stress of lost items by receiving real-time location alerts. Just open the app and track your item’s last known location perfect for keys, wallets, pets, and even your car.

  • Find Your Phone with One Click

    Can’t find your phone? Press the tracker to make your phone ring, even if it’s on silent mode. A quick and easy solution to a common problem.

  • Track Multiple Items at Once

    Connect up to 10 trackers to one phone and monitor different items like bags, pets, keys, or luggage all from a single app. Stay organized with full control in one place.

  • Long Battery Life with Easy Replacement

    Powered by a CR2032 lithium battery, it lasts up to 6 months on standby. When it runs low, simply replace the battery no need to buy a new device.

Perfect For

  • People who frequently misplace keys or bags
  • Parents keeping tabs on kids' belongings
  • Pet owners who want quick location tracking
  • Car owners who forget parking spots
  • Travelers managing suitcases or carry-ons

How One Roll Goes To Work

Three things happen every time you roll it on: it feeds your follicles, balances your scalp, and drives it all root-deep — in seconds a day.

Got questions?

Frequently Asked Questions

Can I use it on my beard and eyebrows?

Yes. The roller-ball is made for targeted spots, so it works on a patchy beard, thinning brows and your hairline — same tube, same routine.

Does it really work without minoxidil?

Yes — with the right expectation. This serum is built to cut shedding, strengthen the hair you have, and make early thinning and your hairline look fuller. It's early intervention and maintenance, not a fix for spots that are already fully bald. Deoxyribose feeds your follicles and supports scalp circulation so hair grows in looking thicker.

Is it safe? Any side effects?

It's dermatologist tested and made without minoxidil, so none of the usual worries. The formula is lightweight and non-irritating for most scalp types. Patch test first if your scalp runs sensitive, and keep it away from kids and pets like any topical.

How long until I see results?

It's not a magic potion — it takes consistency. Many guys notice less hair fall in as little as 2 weeks, with fuller-looking areas around 2–3 months of daily use. Use it every day; that's where the results come from.

Can it be used to track kids?

Yes, this tracker is suitable for keeping track of kids. Simply attach it to their bag, clothing, or personal item and use the app to monitor their location within the Bluetooth range.

Does it have a low battery indicator?

Yes, the app will notify you when the CR2032 battery is running low so you can replace it in time and avoid interruptions.

Is it waterproof?

No, the device is not waterproof. It should be kept away from water or heavy moisture to ensure proper functioning.

Does it work with Android phones?

Yes, it is compatible with Android smartphones running version 4.3 or above and supports Bluetooth 4.0.